← All services/ commercial

Workplace & fleet EV charging in Oxfordshire, Berkshire & Surrey

7 kW home and workplace charge points, load-managed and cleanly routed.

EV Installation work by Ridgeway Electrical

Workplace and fleet charging needs more than a socket on the wall. We size the supply, balance the load across multiple units and set up the back-office reporting you need.

What's included

  • 7.4 kW – 22 kW dual and multiple socket units
  • Load balancing across all bays from one supply
  • Billing, access control and usage reporting options
  • Smart-charging compliant with 2021 regulations
  • Cable management and signage as part of the install

Charge points we install

Common questions

How many bays can one supply run?
With dynamic load balancing, a single supply can serve many bays by sharing available capacity rather than paying for a costly upgrade.
Can we bill staff or visitors?
Yes — we can set up access control, RFID or app-based billing and usage reporting on the back office of your choice.
Do you install three-phase units?
We install 7.4 kW single-phase up to 22 kW three-phase, dual and multiple socket, wall or post mounted.
How disruptive is the work?
Anything from a day to a couple of weeks depending on bay count and trenching. We phase the work around your operating hours.

Recent work

Theale, Reading

Eight-bay workplace charging hub

Eight dual-socket bays from one three-phase supply, dynamically load balanced so staff charging never trips the site's capacity. Access control and monthly usage reporting set up on handover.

Bays
8
Per bay
up to 22 kW
Install
9 days

Phased around our shifts so we never lost the car park for a full day. The reporting alone has paid for itself in admin time.

Facilities Lead, Theale

EV Installation across the Home Counties

We install and maintain ev installation from our Reading base across Oxfordshire, Berkshire, Buckinghamshire and Surrey.